NR NR/WI/ELP/27127 ISSUE 2 PDF

NR NR/WI/ELP/27127 ISSUE 2 PDF

Name:
NR NR/WI/ELP/27127 ISSUE 2 PDF

Published Date:
12/01/2005

Status:
[ Active ]

Description:

Work Instruction for Network Rail/Euro Tunnel Electrical Interface at Folkestone Operating and Maintenance Procedures (aka NR/WI/ELP/27137)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This instruction sets out the electrical operating and maintenance procedures for work on the overhead catenary system, permanent way and distribution equipment at the interface between Network Rail and Eurotunnel at Folkestone.


Edition : 2
File Size : 1 file , 290 KB
Number of Pages : 12
Published : 12/01/2005

History


Related products

NR NR/L3/OPS/045/3.34 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.34: Bridge Strikes from Road Vehicles and Waterborne Vessels
$13.2
NR NR/L3/SCO/313 ISSUE 12
Published Date: 12/03/2022
On-Track Machines (OTMs) Driver and Operations Standards Manual
$13.2
NR RT/LS/G/00023 ISSUE 2
Published Date: 04/01/2004
Best Practicable Means: Control of Noise and Vibration from Construction Operations (aka NR/GN/ENV/00023)
$13.2
NR TI 132 ISSUE 1
Published Date: 02/01/2009
AzLM Reliability
$5.7

Best-Selling Products