Name:
NR NR/WI/ELP/27127 ISSUE 2 PDF
Published Date:
12/01/2005
Status:
[ Active ]
Publisher:
Network Rail
This instruction sets out the electrical operating and maintenance procedures for work on the overhead catenary system, permanent way and distribution equipment at the interface between Network Rail and Eurotunnel at Folkestone.
| Edition : | 2 |
| File Size : | 1 file , 290 KB |
| Number of Pages : | 12 |
| Published : | 12/01/2005 |