NR RT/CE/C/007 ISSUE 1 PDF

NR RT/CE/C/007 ISSUE 1 PDF

Name:
NR RT/CE/C/007 ISSUE 1 PDF

Published Date:
05/01/1995

Status:
[ Inactive ]

Description:

Permanent Way Standard Drawings (RE/PW Series)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

These procedures apply to:

• all drawings that define the form and inter-relationship of civil engineering trackwork components produced by hand draughting or CAD method

• all development drawings, excluding sketches, that may form the basis of future standard drawings. (Development drawings should have a designation of RTD/... during development, and be renumbered in the RE/PW/ series after approval).

These procedures do not apply to:

• Development drawings that are only sketches of outline proposals and require further drawings prior to producing a manufacturing specification.

• Survey, feasibility and scheme drawings for revisions to track geometry unless track components form part of the detailed information.

• drawings produced using non-INTERGRAPH 2D compatible software.

PURPOSE

To define a standard presentation style for the production of Railtrack civil engineering trackwork component and general arrangement drawings.

To define a style of drawing that should be implemented at the development stage and then carried through to the final approved design drawings without substantial reworking.

To define a code of practice for CAD procedures to be used by Railtrack and external CAD drawing originators for the management of CAD data files when producing Railtrack permanent way standard component and assembly drawings, (RE/PW series incl. RTD development drawings).

To define CAD procedures for INTERGRAPH MICROSTATION 2D software, the preferred CAD software when producing track component standard drawings; including the associated "Design Model" and "Design and Plot Composition Files".

To define data transfer procedures between Railtrack and external organisations i.e. contractors and suppliers, that should ensure data produced by Railtrack and non- Railtrack organisations are co-ordinated to a common code of practice to ease data exchange.


Edition : 1
File Size : 1 file , 460 KB
Number of Pages : 44
Published : 05/01/1995

History


Related products

NR NR/CS/OPS/046 ISSUE 6
Published Date: 10/01/2006
The Train Operations Manual
$7.5
NR BRS-SM 2252/2
Published Date: 10/22/1986
Rail Clamp Point Lock Saddle for Cylinder Mounting Plate
$5.7
NR RT/E/P/27179 ISSUE 1
Published Date: 12/01/2004
Cleaning Windscreens & Replacement of Wiper Blades Under AC Overhead Lines (aka NR/SP/ELP/27179)
$18.6
NR NR/L3/OPS/045/5.01 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 5.01: Planned General Inspections and Management of Faults and Defects
$7.5

Best-Selling Products

HIMSS/NEMA HN 1-2008
Published Date:
Manufacturer Disclosure Statement for Medical Device Security
HIMSS/NEMA HN 1-2013
Published Date: 11/01/2013
Manufacturer Disclosure Statement for Medical Device Security
Free Download