NR RT/CE/P/050 ISSUE 2 PDF

NR RT/CE/P/050 ISSUE 2 PDF

Name:
NR RT/CE/P/050 ISSUE 2 PDF

Published Date:
04/01/2004

Status:
[ Inactive ]

Description:

GEOGIS for Network Rail Asset Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

Purpose

GEOGIS (Geography and Infrastructure System) is the Network Rail master database for track and structures assets. It provides information on asset age, configuration, location and for some assets, condition. It is also the master database for the recording and sourcing of information on ELR's and BRS's.

GEOGIS is used to support various business processes and systems for examining and maintaining the infrastructure providing tender information for new, and management information for existing, infrastructure maintenance and examination contracts, including the provision of asset data to MIMS (Mincom Information Management System) as per RT/E/P/02020 and other data systems, and to business plans for infrastructure development schemes.

This Procedure mandates the use of GEOGIS and the processes for the management of the asset data held in GEOGIS and the accuracy, currency and completeness of the asset data held therein as specified in the Network Rail Asset Data Management Manual.

It also sets out the roles and responsibilities for their implementation and ensures that changes to the data owing to asset maintenance, renewal or structural examination are reflected in the database.

The System Owner and Custodian of GEOGIS shall be the Information Management Head of Maintenance & Engineering Delivery. Information Management shall provide technical system and business support to its customers. Responsibility for the timely collection, validation, maintenance, integrity and audit of the data rests with the Maintenance and Engineering departments in the Territories.

This Procedure also mandates that, where responsibility for the collection of data is to be delegated to a contractor, the relevant Network Rail department must include suitable clauses in the contract to ensure that asset data is provided in a timely and accurate way as specified in the Asset Data Management Manual (ADM).


Edition : 2
File Size : 1 file , 180 KB
Number of Pages : 25
Published : 04/01/2004

History


Related products

NR NR/CIV/SD/2086 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: General Arrangement 8.4m Parapet Beam Right Skew 30⁰
$5.7
NR NR/CIV/SD/2251 ISSUE C
Published Date: 09/02/2017
Conarch Overbridge: General Arrangement Internal Unit Lifting Details
$5.7
NR NR/CIV/SD/2031 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: General Arrangement 9.4m Internal Unit Square Span
$5.7
NR NR/L2/TRK/038 ISSUE 8
Published Date: 09/04/2021
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits
$13.2

Best-Selling Products