NR RT/CE/S/042 ISSUE 1 PDF

NR RT/CE/S/042 ISSUE 1 PDF

Name:
NR RT/CE/S/042 ISSUE 1 PDF

Published Date:
04/01/1995

Status:
[ Not for New Design ]

Description:

Track Geometry Recording (aka NR/SP/TRK/042) - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This specification applies to all running lines on which vehicle-based track geometry recording is to be carried out. Generally, the term "running lines" includes loops but excludes sidings and terminal platforms. The running lines concerned and, where applicable, crossovers between them will be defined in the Infrastructure Monitoring Contract.

PURPOSE

This specification defines the performance requirements of the system to be employed on Railtrack's running lines to record track geometry. It specifies the parameters to be measured and the on-board reports which are required, and sets out the interface specification for uploading data into existing management information systems.

Track geometry recording is subject to the provisions of Railway Group Standard GC/EH0038 Track Recording Handbook This specification interprets and enhances certain provisions of that Standard.


Edition : 1
File Size : 1 file , 320 KB
Number of Pages : 18
Published : 04/01/1995

History

NR NR/L2/TRK/042 ISSUE 2
Published Date: 03/02/2024
Track Geometry Recording System Validation Requirements (aka NR/SP/TRK/042)
$13.2
NR RT/CE/S/042 ISSUE 1
Published Date: 04/01/1995
Track Geometry Recording (aka NR/SP/TRK/042) - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2

Related products

NR TPWS/TGN/001 ISSUE 2
Published Date: 04/18/2002
SSI Interface Method 3 Timing Features & their Effects
$13.2
NR BRS-SM 2482
Published Date: 09/07/1995
HW & 63 Electric Point Machines General arrangement L.H. Switch Diamond on Timber 113A Stock Rail, UIC-54B Switch Rail
$5.7
NR NR/L2/SIG/11201/MOD B2 ISSUE 7
Published Date: 06/01/2024
Signalling Design Handbook: Safety Hazards
$13.2
NR BRS-SM 370/1 ISSUE A
Published Date: 08/12/1970
FPL Bar Fitting (BH Rail) Rail Clip - Type 'A'
$5.7

Best-Selling Products

UOP 1-87
Published Date: 01/01/1987
Distillation Range of Heavy Petroleum Oils and Determination of Coke Residue
$86.1
UOP 1000-12
Published Date: 11/01/2012
Smoke Point Determination of Kerosene and Aviation Turbine Fuel Using an Automated Method
$86.1
UOP 1000-13
Published Date: 03/01/2013
Smoke Point Determination of Kerosene and Aviation Turbine Fuel Using an Automated Method
$72
UOP 1001-14
Published Date: 08/21/2014
Chloride and Fluoride in Liquefied Petroleum Gases (LPG) by Combustion Ion Chromatography (CIC)
$72
UOP 1003-13
Published Date: 09/01/2013
Trace Metals in Methanol by ICP-OES
$72
UOP 1005-14
Published Date: 03/01/2014
Trace Metals in Organics by ICP-MS
$72