NR RT/CE/S/082 ISSUE 1 PDF

NR RT/CE/S/082 ISSUE 1 PDF

Name:
NR RT/CE/S/082 ISSUE 1 PDF

Published Date:
04/01/2004

Status:
[ Inactive ]

Description:

Management of Existing Retaining Walls (aka NR/SP/CIV/082)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-rt-ce-s-082-issue-1_2764402

Choose Document Language:
18.60 €
Need Help?
INACTIVE * PDF ONLY

This Specification applies to all Network Rail owned or managed, Shared or Outside Party Retaining Walls and other structures that have been assigned Structure Category B in accordance with RT/CE/P/032, and to those appointed by Network Rail to be responsible for the management of such structures.

Guidance on the assignment of an individual structure to Structure Category B is included in Appendix B. The word "structure" in this Specification means any structure that has been assigned Structure Category B.

The group of Network Rail Standards for the Management of Existing Structures is shown in Appendix B of RT/CE/P/032. Within this Specification, references to Specifications within the group of Standards for the Management of Existing Structures are made in relation to the Structure Category i.e. EX(A) to (G) and the Volume number, as well as the Network Rail Standard.

Health and safety requirements applicable to operational safety are not within the scope of this Specification.

This Specification does not define the organisational and commercial responsibilities for delivering the requirements of the Specification.

Purpose

The purpose of this Specification is to define the requirements for the management of existing Retaining Walls on Network Rail's infrastructure such that there is no unacceptable risk to safety as a result of their condition, use or location.

This Specification contains requirements supplementary to Network Rail Company Standard RT/CE/P/032 - "Managing Existing Structures", in respect of the scope of this Specification. Compliance with this Specification, and with other documents referenced herein, will ensure compliance with RT/CE/P/032 and the Railway Group Standards as listed in Appendix A in respect of the management of structures in the scope of this Specification.


Edition : 1
File Size : 1 file , 390 KB
Number of Pages : 31
Published : 04/01/2004

History


Related products

NR BR 10 ISSUE 2
Published Date: 11/01/1973
Painting Schedule Signal Boxes & Signal Department Equipment
24.30 €
NR BRS-SM 348 ISSUE A
Published Date: 06/29/1971
Facing Point Layout Mechanical for FB and BH Track
5.70 €
NR B00101 ISSUE 3
Published Date: 06/04/2022
Single and Double Line Block Typical Circuits - Electric Token Working - Typical Token Circuit Configuration and Generic Notes
5.70 €
NR RT/ETE/1/1/2
Published Date: 03/17/1998
106lb/yd (52.6Kg/m), 100lb/yd (49.6Kg/m) & 150lb/yd (74.4Kg/m) Steel Conductor Rails. Section & Details
5.70 €

Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
9.00 €
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
9.00 €
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
9.00 €
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
9.00 €
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
9.00 €
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
9.00 €