NR RT/D/C/089 ISSUE 1 PDF

NR RT/D/C/089 ISSUE 1 PDF

Name:
NR RT/D/C/089 ISSUE 1 PDF

Published Date:
10/01/2000

Status:
[ Withdrawn ]

Description:

Transfer of Responsibilities from Outgoing to Incoming Infrastructure Maintenance Contractors

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

The provisions of this Code of Practice apply to all Railtrack Infrastructure Maintenance Contracts.

Purpose

To set out a recommended procedure for the preparation of tender documentation, the tendering process and the letting of new Infrastructure Maintenance Contracts to a programme which allows an adequate Mobilisation Period and ensures that transfer of responsibilities from the Outgoing to the Incoming Contractor can take place. During the Mobilisation Period the Incoming Contractor must be allowed sufficient opportunity to familiarise himself with the Contract Area in a "shadowing" capacity and be given access by the Outgoing Contractor to all necessary information to enable him to assume his full responsibilities under the new Contract from the date for Commencement of Asset Maintenance. In the event of unforeseen delays occurring in the award of the new Contract or the Incoming Contractor failing to mobilise then a Contingency Plan is required to ensure that the assets continue to receive adequate maintenance and remain in a safe and operational condition.


Edition : 1
File Size : 1 file , 130 KB
Number of Pages : 15
Published : 10/01/2000

History


Related products

NR NR/L3/ELP/22001 ISSUE 2
Published Date: 06/04/2022
Procedures and Competence Requirements for Persons Undertaking Works Near High Voltage Cables and Cable Routes
$18.6
NR BRS-SM 2034 ISSUE A
Published Date: 12/21/1994
Colour Light Signals Cranked Stanchion for Use with Four Rails
$5.7
NR NR/L3/CTM/114 ISSUE 3
Published Date: 06/01/2007
Standard Competence and Training Management Procedure Appeals and Complaints
$7.5
NR NR/L2/TRK/0132/03 ISSUE 2
Published Date: 03/04/2023
Maintenance Arc Welding of Rails, Switches and Crossings: Weld Repair of Switches
$13.2

Best-Selling Products

IDEMA H7-94
Published Date: 01/01/1994
Sign Convention Standard
IDEMA H8-94
Published Date: 01/01/1994
Glossary of Suspension Terms Purpose
IDEMA R1-98
Published Date: 01/01/1998
HDD Handling Environment Assessment & Simulation Test Procedure using Test Tailoring
$13.8
IDEMA T11-91
Published Date: 01/01/1991
Window Margin