NR RT/D/P/064 ISSUE 2 PDF

NR RT/D/P/064 ISSUE 2 PDF

Name:
NR RT/D/P/064 ISSUE 2 PDF

Published Date:
04/01/2000

Status:
[ Withdrawn ]

Description:

Monitoring of the Track Litter Clearance Contract (Station Areas) (aka NR/SP/CPR/064)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

Track litter clearance falls into two geographical areas:-

A) Station Areas – through the platforms and up to a point 100m beyond the platform ramp ends.

B) All Other Areas – the remainder of the infrastructure outside Station Areas.

This Procedure only applies to area A

Contractual responsibilities for clearance of track litter are as follows:-

RT1A Contract Areas

A) is not included in the Scope of RT1A (unless it has been varied in by the Employer's Representative) and separate bespoke contracts are let for this.

B) (only) is included in the scope of RT1A.

IMC2 Contract Areas

A and B are included in the scope of IMC2 but the Zones have the option to delete A and continue with the separate bespoke contracts if they so wish.

IMC2000 Contract Areas

A and B are included in the scope of IMC2000 but the Zones have the option to delete A and continue with the separate bespoke contracts if they so wish.

Purpose

This Procedure sets out the principles and responsibilities for monitoring the contracts for clearance of track litter in station areas so as to ensure that the standards laid down in those contracts are achieved and that Railtrack complies with the Environmental Protection Act 1990 in this respect.

This Procedure covers cases both where track litter clearance in station areas is procured via the Infrastructure Maintenance Contract (IMC2 or IMC2000) and by separate bespoke contracts.


Edition : 2
File Size : 1 file , 170 KB
Number of Pages : 12
Published : 04/01/2000

History


Related products

NR NR/L3/MTC/RCS0216/OLE01 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Ground Level Work with OLE Live, Replacement of APC Magnet, Ground Level Bonding
$5.7
NR NR/PRC/MPI/PP03.2 ISSUE 1
Published Date: 10/30/2006
Manage the Plan
$18.6
NR NR/CIV/SD/1701 ISSUE C
Published Date: 09/02/2017
Concrete Underbridges: Underbridge Forms Key to Types
$5.7
NR E10000/100/4 ISSUE B
Published Date: 05/02/1980
Tokenless Block - W.R. Standard Arrangements Ground Frame with Shut-In Facilities
$5.7

Best-Selling Products