Name:
NR RT/E/P/14001 ISSUE 2 PDF
Published Date:
12/01/2000
Status:
[ Inactive ]
Publisher:
Network Rail
This Procedure is mandatory for all work with a signalling content undertaken on Railtrack Infrastructure, which requires testing to the Signal Works Testing Specification, RT/E/S/11221.
Purpose
This Procedure details the method of appointment of the Tester in Charge of a Signalling Scheme (or stage).
The Procedure contains requirements regarding the proposal, assessment and appointment of the Tester in Charge along with acceptance of the role by the individual concerned.
| Edition : | 2 |
| File Size : | 1 file , 160 KB |
| Number of Pages : | 13 |
| Published : | 12/01/2000 |