NR RT/E/WI/00104 ISSUE 2 PDF

NR RT/E/WI/00104 ISSUE 2 PDF

Name:
NR RT/E/WI/00104 ISSUE 2 PDF

Published Date:
08/01/2004

Status:
[ Inactive ]

Description:

Network Rail Company Work Instruction TPWS Risk Based Maintenance (formerly RT/E/WI/00104)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

The tasks detailed within this work instruction are applicable to all currently approved Thales TPWS configurations.

The maintenance tasks shall be applied where implementation of TPWS Track Subsystem Risk Based Maintenance has been authorised in accordance with RT/E/S/10662, ‘Process for the Introduction of New or Revised Maintenance Regimes for Signalling Assets'.

Purpose

To detail the maintenance tasks for the TPWS Track Subsystem risk based maintenance regime.


Edition : 2
File Size : 1 file , 3.6 MB
Number of Pages : 22
Published : 08/01/2004

History


Related products

NR BRS-SM 120/3
Published Date: 03/07/1978
UQ Signal Fittings Heart Thimble Closed for signal wire and wire rope
$5.7
NR NR/L2/CTM/012/031 ISSUE 1
Published Date: 03/06/2010
Sig 31: Install and adjust electro-mechanical point operating systems
$5.7
NR NR/L3/MTC/RCS0216/GA22 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Removal of Discarded Needles & Syringes
$5.7
NR NR/L2/ELP/27213 ISSUE 3
Published Date: 08/26/2008
Maintenance of Mark 3A Overhead Line Equipment
$18.6

Best-Selling Products

IDEMA H7-94
Published Date: 01/01/1994
Sign Convention Standard
IDEMA H8-94
Published Date: 01/01/1994
Glossary of Suspension Terms Purpose
IDEMA R1-98
Published Date: 01/01/1998
HDD Handling Environment Assessment & Simulation Test Procedure using Test Tailoring
$13.8
IDEMA T11-91
Published Date: 01/01/1991
Window Margin