NR NR/L2/CTM/012/031 ISSUE 1 PDF

NR NR/L2/CTM/012/031 ISSUE 1 PDF

Name:
NR NR/L2/CTM/012/031 ISSUE 1 PDF

Published Date:
03/06/2010

Status:
[ Active ]

Description:

Sig 31: Install and adjust electro-mechanical point operating systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This competence standard applies in all circumstances where any person is required to install and adjust electro–mechanical point operating systems on Network Rail managed infrastructure.

The level and extent of responsibility will include their own safety and that of others who might be affected by their work. The person will be expected to refer to others for authorisation when required, will be responsible for the implementation of the instructions and will work within set procedures and specifications. The person is responsible for the quality of their completed work.

Purpose.

The purpose of this competence standard is to define the competence requirements for persons required to install and adjust electro–mechanical point operating systems.


Edition : 1
File Size : 1 file , 29 KB
Number of Pages : 5
Published : 03/06/2010

History


Related products

NR NR/CIV/SD/1130 ISSUE D
Published Date: 12/01/2018
Box Girder Underbridge Corrosion Protection: Main Girders & General Notes
$5.7
NR NB 224 ISSUE 2
Published Date: 03/07/2024
Asbestos-Containing Materials (ACMs) in Signal Relays
$5.7
NR BRS-SW 67-C6 ISSUE 4
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Ground Frames Emergency/Engineers Type
$5.7
NR RT/E/S/27194 ISSUE 1
Published Date: 12/04/2004
General Specification for 25 KV Power Transformers & Solid State Voltage Regulators for Signalling Supplies (Formerly EHQ/SP/D/025)
$24.3

Best-Selling Products

PDA PTC PUPSIT 1
Published Date: 02/01/2020
Points to Consider for Risks Associated with Sterilizing Grade Filters and Sterilizing Filtration
$97.5
PDA PTC PUPSIT 2
Published Date: 03/01/2020
Points to Consider for Implementation of Pre-Use Post-Sterilization Integrity Testing (PUPSIT)
$97.5
PDA TR 13-2
Published Date: 11/01/2020
Technical Report No. 13-2 Fundamentals of an Environmental Monitoring Program Annex 1: Environmental Monitoring of Facilities Manufacturing Low Bioburden Products
$97.5
PDA TR 13
Published Date: 06/01/2014
Technical Report 13 Revised, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 13
Published Date: 04/22/2022
Technical Report 13 Revised 2022, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 14
Published Date: 09/01/2008
PDA Technical Report No. 14 (TR 14) Validation of Column-Based Chromatography Processes for the Purification of Proteins
$97.5