Name:
NR RT/E/WI/00109 ISSUE E1 PDF
Published Date:
02/01/2004
Status:
[ Inactive ]
Publisher:
Network Rail
The scope of this Work Instruction is specifically associated with the use of OTM's. It details the requirements from the planning stage through to the taking and cancellation of the MSO. It defines the Person in Charge of the Machine Switch Out (for this trial the Track Quality Supervisor, (TQS)).
The duration of the trial is specified.
Purpose
The purpose of this document is to provide instruction for the use of On Track Maintenance Machines (OTM's) with integral short-circuiting devices, in association with a Machine Switch Out (MSO).
| Edition : | E1 |
| File Size : | 1 file , 180 KB |
| Number of Pages : | 13 |
| Published : | 02/01/2004 |