Name:
NR RT/E/WI/27061 ISSUE 1 PDF
Published Date:
12/04/2004
Status:
[ Inactive ]
Publisher:
Network Rail
General
Reason To maintain the equipment in a suitable condition and state of adjustment to ensure satisfactory performance.
Periodicity The examination and testing should be carried out at 2 yearly intervals, but may be increased at the discretion of the Local Engineer, where local conditions require this.
Notes
Appropriate action must be taken to institute repairs if any defects are found during the course of this work. If any fault cannot be immediately corrected, the E.C.O. must be informed of the condition of the equipment.
| Edition : | 1 |
| File Size : | 1 file , 230 KB |
| Number of Pages : | 20 |
| Published : | 12/04/2004 |