NR RT/E/WI/27104 ISSUE 1 PDF

NR RT/E/WI/27104 ISSUE 1 PDF

Name:
NR RT/E/WI/27104 ISSUE 1 PDF

Published Date:
12/04/2004

Status:
[ Inactive ]

Description:

Isolation & Earthing at 25 KV AC Feeder Stations with Harmonic Filters & Vacuum Circuit Breakers (aka NR/WI/ELP/27104)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

This document applies only to 25kV feeder stations incorporating vacuum C.B.s and fitted with Harmonic Filters.

Purpose

This document sets out the instructions to be carried out in connection with the issue and cancellation of High Voltage Permits to Work or Sanction for Test, to enable work/testing to be carried out on the equipment or the connections thereto.


Edition : 1
File Size : 1 file , 230 KB
Number of Pages : 30
Published : 12/04/2004

History


Related products

NR BRS-SM 3308 ISSUE 1
Published Date: 04/01/2014
HY-DRIVE MK2 POINT LAYOUT NR60 H LAYOUT
$5.7
NR TWI 3L003 ISSUE 1
Published Date: 03/01/2005
How to Manage a Developing Embankment Slip
$5.7
NR NR/CIV/SD/3028 ISSUE A
Published Date: 09/02/2017
Type 1 Crosswall Platform: Sheet 9 of 15 Lighting Column Details
$5.7
NR BRS-SM 2061 ISSUE C
Published Date: 03/08/1995
Colour Light Signals General Assembly of Signals for 1262 Wide Platform with Central Post & Footstep
$5.7

Best-Selling Products