NR TWI 3L003 ISSUE 1 PDF

NR TWI 3L003 ISSUE 1 PDF

Name:
NR TWI 3L003 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Manage a Developing Embankment Slip

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to deal with a bank slip that is showing, or has shown, signs of slight movement. The movement is likely to be small and intermittent - not enough to prompt a full engineering emergency. This TWI explains how to keep traffic moving with the risks kept to the lowest practicable. Some slip sites have been active for many years - eventually though, the rate of deterioration MAY accelerate enough to cause traffic disruption.

See also separate instructions:

TWI 3G001 How to decide on a differential speed restriction

TWI 3G014 How to manage track under OLE

TWI 3G044 How to manage a watchman

TWI 3G083 How to decide on whether to use a watchman

TWI 3G111 How to arrange an emergency

TSR TWI 3L002 How to manage a developing cutting failure


Edition : 1
File Size : 1 file , 68 KB
Number of Pages : 3
Published : 03/01/2005

History


Related products

NR RT/K/P/010 ISSUE 1
Published Date: 07/01/1997
Management of Invitation to Tender/Quote
$18.6
NR NR/CIV/SD/322 ISSUE E
Published Date: 09/02/2017
Earthwork Drains: Pipes, Channels & Ditches
$5.7
NR RT/D/P/053 ISSUE 1
Published Date: 08/01/1996
ADVICE TO TRAIN OPERATORS OF IMPOSITION, VARIANCE AND WITHDRAWAL OF EMERGENCY SPEED RESTRICTIONS
$13.2
NR NR/SP/OHS/00114 ISSUE 1
Published Date: 08/01/2006
Specialist Risk Assessment - Hand Arm Vibration
$13.2

Best-Selling Products

Metallurgy of Welding
Published Date: 06/01/1999
$26.7