Name:
NR TWI 3L003 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to deal with a bank slip that is showing, or has shown, signs of slight movement. The movement is likely to be small and intermittent - not enough to prompt a full engineering emergency. This TWI explains how to keep traffic moving with the risks kept to the lowest practicable. Some slip sites have been active for many years - eventually though, the rate of deterioration MAY accelerate enough to cause traffic disruption.
See also separate instructions:
TWI 3G001 How to decide on a differential speed restriction
TWI 3G014 How to manage track under OLE
TWI 3G044 How to manage a watchman
TWI 3G083 How to decide on whether to use a watchman
TWI 3G111 How to arrange an emergency
TSR TWI 3L002 How to manage a developing cutting failure
| Edition : | 1 |
| File Size : | 1 file , 68 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |