NR RT/E/WI/27108 ISSUE 1 PDF

NR RT/E/WI/27108 ISSUE 1 PDF

Name:
NR RT/E/WI/27108 ISSUE 1 PDF

Published Date:
12/04/2004

Status:
[ Inactive ]

Description:

Use of Ladders & Other Equipment on OHLE (aka NR/WI/ELP/27108) (The Use of Ladders on Electrified Lines)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INAC NO S/S

These instructions apply to all Electrified Lines on British Rail when ladders are being used to carry out work on overhead line equipment by both British Rail and Contractors' staff.

Purpose

This document details instructions for the use of ladders on Electrified Lines.


Edition : 1
File Size : 1 file , 210 KB
Number of Pages : 21
Published : 12/04/2004

History


Related products

NR NR/L3/SCO/311/02 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
$7.5
NR BRS-SM 579 ISSUE B
Published Date: 06/20/1990
Rail Clamp Point Lock Screw Clamp for Drilling of Stretcher Bar & Tie Bar
$5.7
NR BRS-SM 440/C2 ISSUE C
Published Date: 09/22/1995
Signalling Equipment Framework Battery Shelf Rail for Apparatus Cases
$5.7
NR NR/L3/ELP/27240/NR/DIST C03A ISSUE 3
Published Date: 03/01/2017
Maintenance of K11 25 kV a.c. Switchgear on A.C. Electrified Lines
$5.7

Best-Selling Products

VITA 1.1
Published Date: 01/01/1997
VME64 Extensions
VITA 1.3
Published Date: 01/01/1997
VME64x 9U x 400 mm Format
VITA 1.5
Published Date: 01/01/2003
2eSST Source Synchronous Transfer
VITA 1.6
Published Date: 01/01/2000
Keying for Conduction Cooled VME64x
VITA 1.7
Published Date: 01/01/2003
Increased Current DIN Connector
VITA 12
Published Date: 01/01/1997
M-Module