NR NR/L3/SCO/311/02 ISSUE 3 PDF

NR NR/L3/SCO/311/02 ISSUE 3 PDF

Name:
NR NR/L3/SCO/311/02 ISSUE 3 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module provides requirements that establish an ISO55001 Asset Management System (AMS) within Supply Chain Operations (SCO) for T&RS and OTM assets.

The application of the requirements and procedures contained within this module mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 3
File Size : 1 file , 200 KB
Number of Pages : 8
Published : 03/05/2022

History

NR NR/L3/SCO/311/02 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
$7.5
NR NR/L3/SCO/311/02 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
$7.5
NR NR/L3/SCO/311/02 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
$7.5

Related products

NR NR/L2/ELP/27428/01 ISSUE 1
Published Date: 12/03/2016
Product Specification for National Procurement of OLE Components: Fixings for Railway Electrification Equipment
$13.2
NR TWI 2B013 ISSUE 1
Published Date: 03/01/2005
How to Inspect Drainage
$5.7
NR BR 1987 ISSUE 0.3
Published Date: 07/06/1989
Loud Speaking Emergency Telephone for Use on Underground Station Platforms
$13.2
NR TWI 2S010 ISSUE 1
Published Date: 03/01/2005
How to Replace Slide Baseplates or Chairs in S&C
$7.5

Best-Selling Products

ECMA 100
Published Date: 12/01/1988
Data Interchange on 90mm Flexible Disk Cartridges Using MFM Recording at 7 958 ftprad on 80 Tracks on Each Side-ISO Type 301, Second Edition
ECMA 102
Published Date: 07/01/1987
Rate Adaptation for the Support of Synchronous and Asynchronous Equipment Using the V. Series Type Interface on a PCSN, Second Edition
ECMA 106
Published Date: 12/01/1993
PTN - Signaling Protocol at the S Reference Point - Circuit Mode Basic Services (SSIG-BC), Third Edition
$5.4
ECMA 107
Published Date: 06/01/1995
Volume and File Structure of Disk Cartridges for Information Interchange, Second Edition
$5.4
ECMA 108
Published Date: 12/01/1996
Measurement of High-frequency Noise emitted by Information Technology and Telecommunications Equipment, Third Edition
$5.4
ECMA 109
Published Date: 12/01/1996
Declared Noise Emission Values of Information Technology and Telecommunications Equipment
$5.4