NR RT/LS/P/016 ISSUE 9 PDF

NR RT/LS/P/016 ISSUE 9 PDF

Name:
NR RT/LS/P/016 ISSUE 9 PDF

Published Date:
12/01/2003

Status:
[ Inactive ]

Description:

Identification of the Requirement for and the Review, Acceptance & Maintenance of an Assurance Case

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$35.4
Need Help?
INACTIVE * PDF ONLY

This procedure applies to those people involved with Contractor Assurance Cases. A CAC is required from all contractors directly engaged by Network Rail, before managing the undertaking of physical work on Network Rail Controlled Infrastructure, or those parts of stations, depots, goods or sidings where there is a potential to transfer Risk between the activities of the infrastructure contractor and activities on the controlled infrastructure. A CAC is also required for those contractors engaged by Network Rail for the ‘delivery of possessions'.

Note: No CAC is required if the contractor's activities solely involve any of the following:

• Design

• Provision of labour

• Provision of technically qualified personnel to undertake safety critical work

• Work in a High Street Environment.

Purpose

This procedure mandates the process for Sponsorship of contractors considered potentially suitable for direct contract with Network Rail and the identification of the appropriate level of Assurance Case relevant to the level of risk a particular contractor may bring to Network Rail. It further mandates the process for Review and Acceptance of Contractor Assurance Cases by the relevant Assurance Case Acceptance Manager which all contractors, as defined in the Scope below, are required to have before undertaking work on the Network Rail Controlled Infrastructure.


Edition : 9
File Size : 1 file , 540 KB
Number of Pages : 106
Published : 12/01/2003

History

NR RT/LS/P/016 ISSUE 9
Published Date: 12/01/2003
Identification of the Requirement for and the Review, Acceptance & Maintenance of an Assurance Case
$35.4
NR RT/LS/P/016 ISSUE 8
Published Date: 12/01/2002
Identification of the Requirement for and the Review, Acceptance & Maintenance of an Assurance Case
$35.4
NR RT/LS/P/016 ISSUE 7
Published Date: 04/01/2002
Identification of the Requirement for and the Review, Acceptance & Maintenance of an Assurance Case
$24.3

Related products

NR NR/L1/XNG/100/02 ISSUE 3
Published Date: 09/04/2021
Level Crossing Asset Policy: Level Crossing Technology Strategy
$13.2
NR RT/E/S/10059 ISSUE 1
Published Date: 08/01/1998
Non-Intrusive Earth Leakage Test Adapter for Reed FDM Systems (aka NR/SP/SIG/10059)
$13.2
NR NR/L3/ELP/27240/NR/DIST C10R ISSUE 1
Published Date: 03/02/2019
Maintenance of Micom P921 Protection Relay
$5.7
NR NR/L3/SIGELP/50001 ISSUE 6
Published Date: 12/02/2023
Work Instruction: Signalling Power Distribution Equipment Above 175 V AC
$13.2

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants