NR RT/SIN/049 ISSUE 2A PDF

NR RT/SIN/049 ISSUE 2A PDF

Name:
NR RT/SIN/049 ISSUE 2A PDF

Published Date:
05/01/1993

Status:
[ Withdrawn ]

Description:

Identification of Point Ends

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

The term point ends means any of the following: -

a) A facing point.

b) A trailing point.

c) A swing nose crossing.

d) Each half of a switch diamond crossing (a switch diamond crossing counts as two ends).

e) All forms of trap point.

f) A derailer.

g) A scotch block.

Purpose

Two recent accidents have been caused because points had been secured in the wrong position during emergency working.

To ensure that emergency working and engineering work can be carried out safely it is essential that all point ends are correctly numbered and staff can be certain which is the normally closed switch.

This Inspection Notice sets out the action which is required to check that all point ends are correctly numbered.


Edition : 2A
File Size : 1 file , 48 KB
Number of Pages : 6
Published : 05/01/1993

History


Related products

NR NR/CIV/SD/F003/1300/ADD ISSUE A
Published Date: 12/03/2016
U-Type Underbridges: Span 23m & 25m - Form 003 Addendum
$18.6
NR NR/PRC/MPI/PP07 ISSUE 1
Published Date: 10/20/2006
Resource Planning
$18.6
NR BRS-SW 67-F23 ISSUE 4
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Train Operated Warning System Interlocking B Section VII Circuits
$5.7
NR TWI 3G077 ISSUE 1
Published Date: 03/01/2005
How to Maintain Non-Ballasted Track
$5.7

Best-Selling Products

AI/ASPHALT AI MS-16
Published Date: 03/01/1983
ASPHALT IN PAVEMENT PRESERVATION & MAINTENANCE
AI/ASPHALT AI MS-17
Published Date: 01/01/1969
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 06/01/1983
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 01/01/2000
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-1
Published Date: 01/01/2008
THICKNESS DESIGN ASPHALT PAVEMENTS FOR HIGHWAYS & STREETS
$19.5
AI/ASPHALT AI MS-22
Published Date: 01/01/1983
CONSTRUCTION OF HOT MIX ASPHALT PAVEMENTS
$8.7