NR SAO-SSP(002)-UG-9 ISSUE 1.1 PDF

NR SAO-SSP(002)-UG-9 ISSUE 1.1 PDF

Name:
NR SAO-SSP(002)-UG-9 ISSUE 1.1 PDF

Published Date:
03/26/2001

Status:
[ Active ]

Description:

ARS Factory Tester Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Railtrack Signalling Control Centres (SCCs). Feedback from Railtrack production, operations and maintenance personnel generated the need for various improvements to the IECC including the addition of new IECC functions. Railtrack HQ contracted AEA Technology Rail to develop a package of improvements and new additions to the IECC software specifically focused on the automatic routesetting capability of the IECC.

This package of improvements, designated IECC Upgrade 002, comprises software changes, enhancements and the provision of new functionality to the Automatic Routesetting Subsystem (ARS) and Timetable Processor Subsystem (TTP).

This briefing note provides factory testers with information on the ARS component of IECC Upgrade 002 (aka ARS Upgrade 002).


Edition : 1.1
File Size : 1 file , 49 KB
Number of Pages : 10
Published : 03/26/2001

History


Related products

NR BRS-SM 60/1 ISSUE A
Published Date: 12/12/1977
Colour Light Signals Guard Rail (Side) for Post Signal Stagings
$5.7
NR NR/FP C140 ISSUE 5
Published Date: 03/02/2024
Fixed Plant Work Instructions: Non-Traction High Voltage Apparatus & Substations/Compounds
$7.5
NR RT/E/WI/00104 ISSUE 2
Published Date: 08/01/2004
Network Rail Company Work Instruction TPWS Risk Based Maintenance (formerly RT/E/WI/00104)
$18.6
NR BRS-ST 82/31
Published Date:
Label Terminations (1-10) (11-20) (21-30) (31-40) Lifting Barrier (Auto) MK II B
$5.7

Best-Selling Products