NR SSI8003-82 ISSUE 1 PDF

NR SSI8003-82 ISSUE 1 PDF

Name:
NR SSI8003-82 ISSUE 1 PDF

Published Date:
02/01/2002

Status:
[ Active ]

Description:

SSI Data Preparation - Sequential Proving of Track Circuits (aka RT/SSI/8003-82)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

Introduction

Additional safeguards against irregular operation of track circuits may be required in areas where track circuit operation cannot be relied upon, e.g. areas prone to leaf-fall contamination. Failure of a track circuit to detect a train can lead both to false aspect clearance, and to improper operation of comprehensive approach locking or TORR look-backs. (Wrongful release of route locking ahead of a train is already protected against - see SSI8003- 10F.)

This document provides a data method for dealing with such areas of poor track circuit operation, and builds on that already employed in the Woking control area where sequential proving of track circuits was specifically introduced to address the problem of false aspect clearance in areas prone to leaf-fall contamination.

The areas where sequential proving of track circuits are required are expected to be identified on the signalling scheme plans. It is also expected that additional control tables will be prepared to specifically define the sequential proving controls required.


Edition : 1
File Size : 1 file , 130 KB
Number of Pages : 22
Published : 02/01/2002

History


Related products

NR BRS-SM 840/S2 ISSUE A
Published Date: 01/30/1991
Loc. Base & Platform for Embankments Beam Hole Requirements for Type "A" with Wood Floor
$5.7
NR NR/L3/CIV/140/085C ISSUE 2
Published Date: 08/26/2008
Model Clause 085C: Concrete for Ancillary Purposes
$5.7
NR NR/CIV/SD/1250 ISSUE E
Published Date: 12/01/2018
Z-Type Underbridges: Steelwork Protective Treatment: Notes
$5.7
NR TEF 3105 ISSUE 1
Published Date: 02/01/2007
Plain Line Trial Hole & Soils Data Logging Schedule
$5.7

Best-Selling Products

Laminar Flow Theory
Published Date: 04/01/1996
$9