NR TI 052 ISSUE 3 PDF

NR TI 052 ISSUE 3 PDF

Name:
NR TI 052 ISSUE 3 PDF

Published Date:
06/29/2010

Status:
[ Withdrawn ]

Description:

Auto-Lubrication System for the Rail Clamp Point Lock (RCPL)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-ti-052-issue-3_2762476

Choose Document Language:
5.70 €
Need Help?
W/D * PDF ONLY

The Autolube system is currently approved for use with Standard RCPL (including Switch Diamonds) and IBCL. They are also deployed within the Hy-Drive system.

Purpose

Since 2007, RCPL Lock bodies have been supplied with a facility to allow implementation of the Autolube system, however not all areas with the facility have opted to install the system. The Autolube system is used to overcome "dry lock slide" issues that are commonly reported as a failure mode within the RCPL and In-Bearer Clamp Lock (IBCL).


Edition : 3
File Size : 1 file , 50 KB
Number of Pages : 2
Published : 06/29/2010

History


Related products

NR BRS-SC 38
Published Date: 01/29/1982
Combined Location Base & Platform Beam
5.70 €
NR NR/L2/INI/PG114 ISSUE 3
Published Date: 06/02/2012
Implementation of the Network Rail Project Control Cycle
13.20 €
NR NR/CIV/SD/444 ISSUE F
Published Date: 09/02/2017
Footbridges Non-Stations: Superstructure Ramp Typical Section, Lifting and Drainage Details
5.70 €
NR NR/L2/XNG/30020 ISSUE 4
Published Date: 03/02/2024
Level Crossings Design Handbook
13.20 €

Best-Selling Products