NR TI 166 ISSUE 1 PDF

NR TI 166 ISSUE 1 PDF

Name:
NR TI 166 ISSUE 1 PDF

Published Date:
01/18/2012

Status:
[ Withdrawn ]

Description:

Issue with Continuity of SSI TT Log Dats

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

This TI applies to:

All SSI installations using SSI4301-D7 Software in their Technicians Terminal and SSI Graphical Replay software SSI8314-B2 versions 2.0 and above.

It applies to all personnel who use SSI Graphical Replay to read SSI Technicians Terminal Logs as an aide to faulting and maintenance or incident investigation.

It applies when downloading and reading SSI Technicians Terminal Log files using SSI Graphical Replay in the circumstances detailed above..

Purpose

An issue has been discovered with the SSI4301-D7 TT software upgrade in that, in certain circumstances, data can be held for a short time in the TT buffer before being sent to the logger. Suspected causes include time adjustment with reference to the Radio Clock and temporary unavailability of the connected logging device. This can confuse the SSI Graphical Replay (SSI GR) application when the data is accessed for analysis. SSI GR SSI8314-B2, Versions 2.0 and earlier may report incorrect times in the file open dialogue and analysis. Version 2.1 will report that there are inconsistencies in the time stamps, but will usually allow analysis to proceed.

A work round has been identified to enable the data to be analysed with minimal affect on any timing. The use of this process will need to be recorded if the data is required as evidence in a serious accident investigation. Also, to maintain the chain of evidence, original log files should not be modified and copies of the log files should be used.


Edition : 1
File Size : 1 file , 28 KB
Number of Pages : 2
Published : 01/18/2012

History


Related products

NR NR/L2/RMVP/0200/P006 ISSUE 2
Published Date: 03/03/2012
Plant Operations Manual: Safe Use of Plant for Infrastructure Work
$24.3
NR NR/L3/OPS/045/2.08 ISSUE 1
Published Date: 12/07/2019
National Operating Procedure (NOP) 2.08: Competency Framework to Carry Out the Role of Level Crossing Keeper
$13.2
NR RT/E/C/19026 ISSUE 1
Published Date: 12/01/1999
Signalling Equipment Technical Advice Notice (SIGTAN 026) Track Circuit Equipment (aka NR/GN/SIG/19026)
$7.5
NR NR/OTK/SD/BM/110/SPEC ISSUE B02
Published Date: 12/04/2021
Class IA Security Palisade Slotted or Bolted Pale System Fence - Specification
$5.7

Best-Selling Products

A Guide to Builders Hardware Terminology
Published Date: 07/01/1991
$7.2
BHMA 156.2-1989
Published Date: 01/01/1989
Bored and Preassembled Locks and Latches
$10.5
BHMA A115 SET
Published Date:
COMPLETE SET - HISTORICAL REFERENCE A115 Specifications for Steel Door and Frame Preparation for Hardware DOCUMENT (A115.1-A115.18)
$12
BHMA A115.W SET
Published Date:
COMPLETE SET - HISTORICAL REFERENCE A115 Wood Door Hardware Standards Hardware Preparation DOCUMENT (A115.1-A115.18)
$12
BHMA A156.1-2000
Published Date:
Butts & Hinges
$12
BHMA A156.1-2013
Published Date: 03/07/2013
Butts & Hinges
$12