Name:
NR TI 171 ISSUE 1 PDF
Published Date:
08/10/2012
Status:
[ Active ]
Publisher:
Network Rail
This TI relates to a change in the number of supplementary detection elements when S&C units are being renewed. A change may arise from a change in point operating mechanism, rail profile or switch type. It applies to signalling designers, testers, and project engineers.
Purpose
A change to the number of detection elements associated with a set of points can require significant documentation and testing. This instruction provides rules to enable efficient renewals and upgrades of S&C layouts.
| Edition : | 1 |
| File Size : | 1 file , 25 KB |
| Number of Pages : | 2 |
| Published : | 08/10/2012 |