NR TPWS/TGN/020 ISSUE 1 PDF

NR TPWS/TGN/020 ISSUE 1 PDF

Name:
NR TPWS/TGN/020 ISSUE 1 PDF

Published Date:
03/17/2003

Status:
[ Withdrawn ]

Description:

Interleaving of TPWS Transmitter Loops

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

This Technical Guidance Note clarifies the current position regarding the acceptability of interleaving PSR OSSs with the existing signal OSSs and TSSs.


Edition : 1
File Size : 1 file , 710 KB
Number of Pages : 8
Published : 03/17/2003

History


Related products

NR NR/L3/RMVP/0201/CAL406 ISSUE 1
Published Date: 03/05/2011
Calibration of Starrett Taper Gauges
$5.7
NR NR/L2/TEL/30034 ISSUE 4
Published Date: 03/06/2010
Radio Mast Lightning Protection and Earthing System
$18.6
NR NR/L2/SIG/19820/K02 ISSUE 1
Published Date: 03/05/2022
Signalling and Level Crossing Product Specifications: Equipment Enclosures
$13.2
NR BRS-SM 840/S1 ISSUE C
Published Date: 05/15/1991
Loc, Base & Platform for Embankments General Assembly - Type "A" with Wood Floor
$5.7

Best-Selling Products

STI/SPFA R972
Published Date: 12/01/2010
Recommended Practice for the Addition of Supplemental Anodes to sti-P3 USTs (R972)
$9
STI/SPFA SP001
Published Date: 01/01/2018
Standard for the Inspection of Aboveground Storage Tanks
$58.5
STI/SPFA SP001
Published Date: 09/01/2011
Standard for the Inspection of Aboveground Storage Tanks
$51
STI/SPFA SP001
Published Date: 02/01/2024
Standard for the Inspection of Aboveground Storage Tanks
$58.5