NR TPWS/TI/008 ISSUE 5 PDF

NR TPWS/TI/008 ISSUE 5 PDF

Name:
NR TPWS/TI/008 ISSUE 5 PDF

Published Date:
06/01/2003

Status:
[ Withdrawn ]

Description:

Managing Defective Thales TPWS Trackside Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This Technical Instruction is mandatory and applies to all TPWS track sub-system equipment supplied by TCL which becomes defective whilst still under warranty. This includes equipment found defective or damaged on delivery, or equipment diagnosed as being faulty on pre-commissioning testing or when in service. The Instruction applies irrespective of whether the equipment is commissioned.

This instruction also applies to equipment required to be returned to TCL for modification, reconditioning or under a product recall. Section 7 of this Technical Instruction covers the return of Phosphor Bronze contact Modules following an agreement reached between Network Rail (formerly Railtrack) and Thales Communications Ltd. This action is being instituted due to the recall of all Phosphor Bronze Modules.

This instruction does not include the process to be followed where TPWS equipment is involved in an alleged Wrong Side Failure, which will be dealt with separately via WS Atkins Rail at Crewe.


Edition : 5
File Size : 1 file , 390 KB
Number of Pages : 19
Published : 06/01/2003

History


Related products

NR NR/CIV/SD/2161-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 9.4m External Unit Square Span
$5.7
NR TWI 2G073 ISSUE 1
Published Date: 03/01/2005
How to Inspect a Conductor Rail
$5.7
NR NR/L3/ELP/27052 ISSUE 8
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line
$13.2
NR NR/L3/TRK/002/G13 ISSUE 1
Published Date: 03/01/2008
Renew Heater Pads
$5.7

Best-Selling Products