Name:
NR TWI 2G073 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction explains how to deal with conductor rail inspection in the third and fourth rail areas.
See also separate instructions:
TWI 2G003 How to recognise & use insulated tools
TWI 2G012 How to replace a pot
TWI 2G078 How to work with DC electrification
| Edition : | 1 |
| File Size : | 1 file , 110 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |