NR TPWS/TI/037 ISSUE 1 PDF

NR TPWS/TI/037 ISSUE 1 PDF

Name:
NR TPWS/TI/037 ISSUE 1 PDF

Published Date:
03/17/2003

Status:
[ Withdrawn ]

Description:

Overlay of TPWS in Radio Electronic Token Block (Retb) Areas

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
W/D S/S BY NR RT/E/S/10178 * PDF ONLY

This Technical Instruction applies to the overlay of TPWS on all routes operated by the RETB system of signalling.

PURPOSE

This Technical Instruction describes the overlay of TPWS on routes operated by the RETB system of signalling and outlines the requirements for this by reference to supporting documentation. It also specifies the following:

  • selection of which Stop Boards require TPWS fitment;
  • the operational (functional and safety) requirements for the overlay of TPWS on the RETB system.

Edition : 1
File Size : 1 file , 190 KB
Number of Pages : 21
Published : 03/17/2003

History


Related products

NR NR/L3/SIG/11235/G130/SS1051 ISSUE 1
Published Date: 09/04/2021
Signal Maintenance Testing Handbook: Install a New or Replacement SSI LDT Filter
$5.7
NR SCS-SSP(003)-UG-8 ISSUE 4
Published Date: 01/30/2004
IECC Upgrade 003 Roll Out Briefing Note
$13.2
NR NR/L3/CIV/140/083C ISSUE 2
Published Date: 08/26/2008
Model Clause 083C: Structural Concrete Repairs
$13.2
NR NR/L3/CIV/300 ISSUE 1
Published Date: 06/02/2007
Managing Complaints about Pigeons
$18.6

Best-Selling Products

CRANE PIPING SYSTEM FUNDAMENTALS
Published Date:
Piping System Fundamentals: The Complete Guide to Gaining a Clear Picture of Your Piping System
$47.1
CRANE TP 410 METRIC
Published Date:
Flow of Fluids: Through Valves, Fittings, and Pipe
CRANE TP 410 U.S.
Published Date:
Flow of Fluids: Through Valves, Fittings, and Pipe