Name:
NR TWI 2C030 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to fit multi-groove locking pins:
• In S&C crossing assemblies
• As stud bolts in continuous check rails
• In some insulated joints. See also separate instructions:
TWI 2S016 How to replace a stock rail bolt
TWI 2C025 How to change a check rail bolt
TWI 2G032 How to replace and maintain an insulated joint in jointed track
TWI 2G089 How to replace and maintain an insulated joint in CWR
| Edition : | 1 |
| File Size : | 1 file , 110 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |