Name:
NR TWI 2G041 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Revised ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to install a temporary joint. You may need to do this if you are not able to fully complete your work and need to open a line to traffic. Although you may have to open the line at a reduced speed, you will avoid the serious delays that would occur with a blocked line.
See also separate instructions:
TWI 2C037 How to carry out rail adjusting/pulling back rails
TWI 2G010 How to use a rail saw
TWI 2G011 How to use a rail drill
TWI 2G037 How to install Emergency clamped fishplates
TWI 2G043 How to carry out disc cutting rail
TWI 2S032 How to install a closure rail
| Edition : | 1 |
| File Size : | 1 file , 160 KB |
| Number of Pages : | 4 |
| Published : | 03/01/2005 |