NR TWI 2P006 ISSUE 1 PDF

NR TWI 2P006 ISSUE 1 PDF

Name:
NR TWI 2P006 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Tighten Plain Line Rail Fastenings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

Introduction

All rail fastenings must be kept tight to maintain the toe load on the rail. Loss of toe load will allow the rail to move lengthways, leading to buckling in CWR due to a loss of stress and in jointed track due to tight joints.

Loose fastenings can also lead to gauge spread through sideways movement. Any vertical vibration can lead to pad, insulator and sleeper wear.

This Track Work Instruction deals with the tightening of loose rail fastenings. See also the separate instruction:

TWI 2P004 How to remove and fit spike fastenings

TWI 2C008 How to install maintenance fastenings

TWI 2P048 How to change a plain line baseplate or chair


Edition : 1
File Size : 1 file , 330 KB
Number of Pages : 6
Published : 03/01/2005

History


Related products

NR NR/L3/CIV/604 ISSUE 1
Published Date: 12/04/2021
Highways Interface Manual
$7.5
NR NR/CIV/SD/553 ISSUE E
Published Date: 09/02/2017
Tunnels - Sprayed Concrete Lining Renewal: Crown Breakout & Replacement
$5.7
NR BRS-SM 501/26 ISSUE D
Published Date: 09/12/1990
Rail Clamp Point Lock Coupling Bolt
$5.7
NR TEF 3291 ISSUE 3
Published Date: 12/04/2021
Critical Rail Temperature Assessment Form 4 for Jointed Track Sites
$5.7

Best-Selling Products

Laminar Flow Theory
Published Date: 04/01/1996
$9