Name:
NR TWI 2S016 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers the replacement of a single broken stud bolt (or stock rail bolt).
If the S&C unit is fitted with MGL pins, a repair may be made using a stud bolt or “Muckle” bolt, pending the permanent repair with an MGL pin.
If the unit is fitted with bolts, then the repair must be made using an appropriate bolt or “Muckle” bolt. MGL pins must not be installed on an individual basis; you should fit the entire assembly.
“Muckle” pins are a temporary repair; permanent replacement must be carried out within 4 weeks.
See also separate instructions: TWI 2C030 How to install MGL pins
| Edition : | 1 |
| File Size : | 1 file , 58 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |