NR TWI 2S031 ISSUE 1 PDF

NR TWI 2S031 ISSUE 1 PDF

Name:
NR TWI 2S031 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Replace a Check Rail in S&C

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to replace a conventional check rail in BH and 113A FB S&C. Guidance on RT60/NR60 S&C is given at the end of this TWI.

Although train wheels do not run on the checkrail, the checkrail is a vital part of a layout that stops the wheel flange from going the wrong side of the crossing nose.

N.B. If a train runs over a layout that has a missing checkrail, it will derail! See also the separate instructions:

TWI 2S009 How to replace a baseplate in S&C

 


Edition : 1
File Size : 1 file , 110 KB
Number of Pages : 4
Published : 03/01/2005

History


Related products

NR TWI 2S033 ISSUE 4
Published Date: 06/01/2014
How to Carry out a Complete Treatment of Switches on Timber Bearers
$18.6
NR NR/L3/MTC/0009 ISSUE 4
Published Date: 09/05/2009
Risk Control Sheet Manual: OLE
$7.5
NR NR/CIV/SD/630 ISSUE B
Published Date: 09/02/2017
Typical Spalled Concrete Repairs
$5.7
NR NR/L3/MTC/RCS0216/LW04 ISSUE 3
Published Date: 03/03/2012
Risk Control Manual: Working Under Live OLE: Dumper Mounted RRV Cranes - Lifting Operations
$5.7

Best-Selling Products

STI/SPFA R972
Published Date: 12/01/2010
Recommended Practice for the Addition of Supplemental Anodes to sti-P3 USTs (R972)
$9
STI/SPFA SP001
Published Date: 01/01/2018
Standard for the Inspection of Aboveground Storage Tanks
$58.5
STI/SPFA SP001
Published Date: 09/01/2011
Standard for the Inspection of Aboveground Storage Tanks
$51
STI/SPFA SP001
Published Date: 02/01/2024
Standard for the Inspection of Aboveground Storage Tanks
$58.5