NR TWI 2S033 ISSUE 4 PDF

NR TWI 2S033 ISSUE 4 PDF

Name:
NR TWI 2S033 ISSUE 4 PDF

Published Date:
06/01/2014

Status:
[ Active ]

Description:

How to Carry out a Complete Treatment of Switches on Timber Bearers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

Introduction

This track work information sheet explains how to carry out a Complete Treatment of S&C on timber bearers. It covers:

• A full scope to identify the work including checking the line, top and gauge of switches

• Identification of associated works

• Tightening and replacing bolts

• Datum rail alignment

• Stock rail squaring

• Re-gauging

• Replacement of all fastenings, screws and ferrules

• Correction of top through the switch

This task involves P-Way and S&T forming a multi-discipline team, especially when reconnecting point operating equipment.

See also: Appendix A for scoping document for Complete Treatment Appendix B for TEF 3239 dimensions It does not include adjusting the squareness of the switch toes.

If the toes are found to be out of alignment during the scope, this shall be rectified before this task can carried out.

 


Edition : 4
File Size : 1 file , 2.1 MB
Number of Pages : 32
Published : 06/01/2014

History


Related products

NR NR/CIV/SD/2171-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m Concrete Parapet Beam Square Span
$5.7
NR RT/E/S/10073 ISSUE 1
Published Date: 02/01/1998
Barrier Boom Light Units for Level Crossings (aka NR/SP/SIG/10073)
$13.2
NR NR/L2/RSE/015 ISSUE 6
Published Date: 08/26/2008
Acceptance Panel (aka NR/CS/ACC/015 or NR/SP/ACC/015)
$18.6
NR NR/L3/TRK/7013 ISSUE 1
Published Date: 09/04/2021
Planning and Installation of Temporary Rail Joints
$18.6

Best-Selling Products