Name:
NR TWI 2S033 ISSUE 4 PDF
Published Date:
06/01/2014
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This track work information sheet explains how to carry out a Complete Treatment of S&C on timber bearers. It covers:
• A full scope to identify the work including checking the line, top and gauge of switches
• Identification of associated works
• Tightening and replacing bolts
• Datum rail alignment
• Stock rail squaring
• Re-gauging
• Replacement of all fastenings, screws and ferrules
• Correction of top through the switch
This task involves P-Way and S&T forming a multi-discipline team, especially when reconnecting point operating equipment.
See also: Appendix A for scoping document for Complete Treatment Appendix B for TEF 3239 dimensions It does not include adjusting the squareness of the switch toes.
If the toes are found to be out of alignment during the scope, this shall be rectified before this task can carried out.
| Edition : | 4 |
| File Size : | 1 file , 2.1 MB |
| Number of Pages : | 32 |
| Published : | 06/01/2014 |