Name:
NR TWI 2S080 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to correct top or twist faults in S&C using hand held stoneblowers.
This TWI only describes the additional factors you need to consider when lifting and packing S&C using stoneblowers.
See also otherTWIs that provide details of packing methods:
TWI 2G004 How to measure voids
TWI 2T007 How to carry out measured shovel packing
TWI 2T010 How to carry out kango packing
TWI 2T014 How to lift and pack S&C
TWI 2T025 How to carry out hand held stone blowing
There are further instructions covering most aspects of S&C maintenance. These are listed at the end of this TWI.
| Edition : | 1 |
| File Size : | 1 file , 58 KB |
| Number of Pages : | 4 |
| Published : | 03/01/2005 |