Name:
NR TWI 3B006 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers the management of track that has multiple wet beds.
The instruction gives guidance on the strategies that can be followed both before and after repairs are carried out.
See also separate instructions:
TWI 2B002 How to recognise wet bed formation
TWI 2B005 How to prevent wet bed formation
TWI 2B006 How to treat wet beds
TWI 3B001 How to dispose of contaminated ballast
TWI 3B003 How to understand blanket design
TWI 4B001 How to decide on the appropriate ballast failure treatment
| Edition : | 1 |
| File Size : | 1 file , 67 KB |
| Number of Pages : | 4 |
| Published : | 03/01/2005 |