NR TWI 3B013 ISSUE 1 PDF

NR TWI 3B013 ISSUE 1 PDF

Name:
NR TWI 3B013 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Manage Subsidence

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-twi-3b013-issue-1_2763253

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to manage the subsidence effects caused by mining, mineral extraction, engineering works, geological collapse or formation changes.

Settlement due to planned Engineering work to accommodate Outside Party projects – e.g. Thrust bores – are excluded from this TWI.

See also separate instructions:

TWI 3G050 How to manage track inspections

TWI 3G051 How to arrange routine inspections


Edition : 1
File Size : 1 file , 73 KB
Number of Pages : 6
Published : 03/01/2005

History


Related products

NR NR/L1/INF/02230 ISSUE 3
Published Date: 12/05/2020
Corporate Archive Policy (aka NR/L2/INF/02230)
13.20 €
NR E10000/101/5 ISSUE A
Published Date: 01/01/1976
Reversible Signalling - One Line (Between Two Panels) Int. 'B' (Former WR Variant)
5.70 €
NR SSIDIS193 ISSUE 1
Published Date: 12/17/2014
Over-Run Protection
13.20 €
NR TI 013 ISSUE 4
Published Date: 08/26/2008
Signal Sighting: Sunlight Issues
5.70 €

Best-Selling Products

FCI 13-1-2022
Published Date: 2022
Determining Condensate Loads to Size Steam Traps
66.00 €
FCI 15-1-2020
Published Date: 2020
Standard for Production Testing of Pressure Regulators
49.50 €
FCI 17-1-2018
Published Date: 10/01/2018
Standard for Production Testing of Sanitary Pressure Regulators
33.00 €
FCI 18-1-2021
Published Date: 2021
Standard for Sizing and Selection of Type 1 Secondary Pressure Drainers
33.00 €
FCI 18-2-2020
Published Date: 2020
Standard for Installation of Type 1 Secondary Pressure Drainers
33.00 €