NR TWI 3G008 ISSUE 1 PDF

NR TWI 3G008 ISSUE 1 PDF

Name:
NR TWI 3G008 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Manage a Change in Traffic

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-twi-3g008-issue-1_2766586

Choose Document Language:
5.70 €
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to prepare for the introduction of new rolling stock on a route.

Normally, specialists (such as gauging engineers) carry out this type of clearance, but this TWI gives guidance on the physical works that may need to be carried out along with some maintenance considerations.

See also separate instructions:

TWI 3G006 How to manage permanent increases in line speed

TWI 4G003 How to manage an increase in tonnage

TWI 4G004 How to manage a change of rolling stock/traction

TWI 4G005 How to manage temporary experimental increases in line speed


Edition : 1
File Size : 1 file , 60 KB
Number of Pages : 2
Published : 03/01/2005

History


Related products

NR TEF 3060 ISSUE 4
Published Date: 12/01/2013
Management of Gauge: Periodic Inside Slip Inspection
5.70 €
NR NR/L3/ELP/29987/MOD11 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Working On Overhead Line Equipment
13.20 €
NR X70200 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits 4 Barrier Detection Circuits (2)
5.70 €
NR NR/CIV/SD/1151 ISSUE C
Published Date: 09/02/2017
Box Girder Underbridge Lifting Cleats for Main Girders: Using Single Crane
5.70 €

Best-Selling Products

EPI DCOS (C)
Published Date: 02/01/2016
(CHINESE - TRADITIONAL) Data Centre Operations Standard
41.10 €
EPI DCOS (S)
Published Date: 05/01/2016
(SPANISH) Estándar de Operaciones de Centros de Datos
41.10 €
EPI DCOS
Published Date: 10/01/2021
Data Centre Operations Standard
4.20 €
EPI DCOS
Published Date: 02/01/2016
(ENGLISH) Data Centre Operations Standard
41.10 €