Name:
NR TWI 3G016 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to manage the problems associated with BR1 track. (BR1 track is flat bottom rail on BR1 baseplates fitted with elastic spikes on timber sleepers). It is usually jointed. However, some has been welded to create CWR where the elastic spikes have been enhanced with additional fastenings). See also separate instructions:
TWI 2G092 How to use a dynamic track gauge
TWI 2B008 How to recognise ballast type
TWI 2P003 How to lubricate fishplates
TWI 2P026 How to carry out joint straightening
TWI 2P040 How to joint shim
TWI 3C015 How to manage rail creep
TWI 3C026 How to manage dynamic gauge spread
TWI 3P067 How to plan & organise rail adjusting
TWI 4G002 How to formulate a strategy for track maintenance and renewal
TWI 4G013 How to produce an annual maintenance plan RT/CE/S/103 Track Inspection Requirements
| Edition : | 1 |
| File Size : | 1 file , 67 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |