NR TWI 3G016 ISSUE 1 PDF

NR TWI 3G016 ISSUE 1 PDF

Name:
NR TWI 3G016 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Manage BR1 Track

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to manage the problems associated with BR1 track. (BR1 track is flat bottom rail on BR1 baseplates fitted with elastic spikes on timber sleepers). It is usually jointed. However, some has been welded to create CWR where the elastic spikes have been enhanced with additional fastenings). See also separate instructions:

TWI 2G092 How to use a dynamic track gauge

TWI 2B008 How to recognise ballast type

TWI 2P003 How to lubricate fishplates

TWI 2P026 How to carry out joint straightening

TWI 2P040 How to joint shim

TWI 3C015 How to manage rail creep

TWI 3C026 How to manage dynamic gauge spread

TWI 3P067 How to plan & organise rail adjusting

TWI 4G002 How to formulate a strategy for track maintenance and renewal

TWI 4G013 How to produce an annual maintenance plan RT/CE/S/103 Track Inspection Requirements


Edition : 1
File Size : 1 file , 67 KB
Number of Pages : 3
Published : 03/01/2005

History


Related products

NR NR/WI/ELP/27231 ISSUE 1
Published Date: 12/01/2005
Work Instruction for Operation of 11kV Supplies at Slade Green Depot, Ashford IECC and Victoria Station
$13.2
NR NR/L2/CTM/012/016 ISSUE 1
Published Date: 03/06/2010
SIG 16: Undertake Corrective and Preventative Maintenance of Lever Frames & Locks & Circuit Controllers
$7.5
NR BRS-SW 67-42A ISSUE 2
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Swinging Overlaps - Complicated Cases, Point Anti-Pre-Selection Circuits (1)
$5.7
NR NR/L2/TEL/30146 ISSUE 2
Published Date: 12/04/2010
Product Specification for UMTS, GSM and GSM-R Modems
$7.5

Best-Selling Products