Name:
NR TWI 3G048 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to inspect a culvert. The purpose of this inspection is to confirm that a culvert is working correctly i.e. carrying water from one end to the other unobstructed.
This is not a structural examination, but there will be signs that need to be noted so that qualified examiners can be brought in to detect structural problems.
See also separate instructions:
TWI 2B009 How to maintain catchpits
TWI 2B011 How to recognise a drain failure
TWI 2B012 How to maintain drains
TWI 2B013 How to inspect drainage
TWI 2B017 How to maintain open drains, watercourses and ditches
| Edition : | 1 |
| File Size : | 1 file , 52 KB |
| Number of Pages : | 2 |
| Published : | 03/01/2005 |