Name:
NR TWI 3L002 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers managing and monitoring a possible failure of a cutting slope.
See also separate instructions:
TWI 2G019 How to apply a speed restriction in an emergency
TWI 3G044 How to manage a watchman
TWI 3G083 How to decide on whether to use a watchman
TWI 3G111 How to arrange an emergency temporary speed restriction
TWI 3L003 How to manage a developing embankment slip.
Look at the top and line of the track at the cutting toe - if there is any sign of the track heaving up then report back immediately. This is a sign of a slip circle developing which can lead to a serious failure of not only the cutting face but also the track.
| Edition : | 1 |
| File Size : | 1 file , 170 KB |
| Number of Pages : | 2 |
| Published : | 03/01/2005 |