NR TWI 3P036 ISSUE 1 PDF

NR TWI 3P036 ISSUE 1 PDF

Name:
NR TWI 3P036 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Plan the Rerailing of Jointed Track

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to plan the re-railing of jointed track on existing chairs or baseplates.

See also separate instructions:

TWI 2C007 How to remove seized fastenings

TWI 2P007 How to identify rail section & steel

TWI 2P024 How to repair seized joints

TWI 2S073 How to maintain check rail

TWI 3P051 How to fit continuous check rails

TWI 3P061 How to measure & define leads and lags


Edition : 1
File Size : 1 file , 27 KB
Number of Pages : 3
Published : 03/01/2005

History


Related products

NR NR/L2/TRK/001 ISSUE 24
Published Date: 03/02/2024
Inspection and Maintenance of Permanent Way
$13.2
NR NR/L2/SIG/30014/D120/TS17-01 ISSUE 2
Published Date: 03/03/2018
Signalling Works Testing Handbook: Integration Testing - Relay Through Circuit Test Specification
$5.7
NR RT/CE/S/087 ISSUE 1
Published Date: 04/01/2004
Management of Existing Buildings & Station Structures (aka NR/SP/CIV/087)
$18.6
NR TI 073 ISSUE 1
Published Date: 08/01/2007
Use of Lockout Devices for Staff Protection
$5.7

Best-Selling Products

3A 00-00
Published Date: 09/08/2014
3-A Sanitary Standards for General Requirements
3A 00-01-2018
Published Date: 02/01/2018
3-A Sanitary Standard for General Requirements
$105
3A 00-01
Published Date: 06/05/2017
3-A Sanitary Standard for General Requirements
3A 01-08
Published Date: 11/20/2001
Storage Tanks for Milk and Milk Products
3A 01-09
Published Date: 11/19/2013
Insulated Tanks
$59.7
3A 02-09
Published Date: 11/01/1996
Centrifugal and Positive Rotary Pumps for Milk and Milk Products