NR TWI 3T041 ISSUE 1 PDF

NR TWI 3T041 ISSUE 1 PDF

Name:
NR TWI 3T041 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Manage Plain Line Tamping

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to plan and manage maintenance tamping of PLAIN LINE.

Tamping is the most efficient means of maintaining top and line. However, it is an expensive resource that must be used in a way that ensures that no time is lost and the maximum output is achieved.

See also the separate instruction:

TWI 3T030 How to maintain a high speed curve


Edition : 1
File Size : 1 file , 52 KB
Number of Pages : 3
Published : 03/01/2005

History


Related products

NR NR/CIV/SD/FORMB/665 ISSUE P1
Published Date: 06/17/2011
Form B: LOC bases
$5.7
NR NR/CIV/SD/1368 ISSUE F
Published Date: 09/02/2017
U-Type Underbridges: Concrete & Reinforcement: Reinforcement Details for 25 to 50 Degrees Skew Floor
$5.7
NR NR/L2/SIGELP/27416 ISSUE 1
Published Date: 03/04/2017
Alterations to Signalling Power Systems
$24.3
NR TWI 3B004 ISSUE 1
Published Date: 03/01/2005
How to Plan Ballast Regulation
$5.7

Best-Selling Products