Name:
NR TWI 3T041 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to plan and manage maintenance tamping of PLAIN LINE.
Tamping is the most efficient means of maintaining top and line. However, it is an expensive resource that must be used in a way that ensures that no time is lost and the maximum output is achieved.
See also the separate instruction:
TWI 3T030 How to maintain a high speed curve
| Edition : | 1 |
| File Size : | 1 file , 52 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |