Buildings XI Conference -- Developing an Exterior Enclosure Commissioning Plan PDF

Buildings XI Conference -- Developing an Exterior Enclosure Commissioning Plan PDF

Name:
Buildings XI Conference -- Developing an Exterior Enclosure Commissioning Plan PDF

Published Date:
2010

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Every building is unique; however, performance testing identified in typical project specifications usually approaches the building enclosure in the same manner. Similarly, a predefined commissioning plan will not likely be appropriate for every project. Commissioning, similar to the design and construction of a building enclosure, is a dynamic and complex process; responsive to the Owner's Project Requirements (OPR), the design, the function, and the occupant needs. The process must be tailored to suit and adaptable.

The building enclosure commissioning process is defined by the design and the construction phases. The construction phase validates the design phase. A commissioning plan's construction phase must respond to the unique attributes of each design detail by establishing a comprehensive schedule of tests and reviews. The objective is to ensure the building enclosure performs in accordance with the OPR and functions as both a coordinated whole and separate components.

This paper briefly outlines the building commissioning plan from project inception through occupancy. Various approaches to the design phase of the commissioning plan are examined. Through the use of case studies, the construction phase of a building enclosure commissioning plan is reviewed. The case studies focus on the parameters for defining the testing type, extent, and methodologies utilized to conduct the schedule of tests in addition to lessons learned from the commissioning of these case study buildings.


File Size : 1 file , 6.8 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 14
Product Code(s) : D-BUILDINGSXI-160
Published : 2010

History


Related products


Best-Selling Products

Stallcup's Electrical Design Book
Published Date: 08/01/1999