CH-09-036 -- BACnet Object Modeling by UML on High-Level Functionality of VRF Air-Conditioning Systems PDF

CH-09-036 -- BACnet Object Modeling by UML on High-Level Functionality of VRF Air-Conditioning Systems PDF

Name:
CH-09-036 -- BACnet Object Modeling by UML on High-Level Functionality of VRF Air-Conditioning Systems PDF

Published Date:
2009

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

This paper provides a new implementation model of the BACnet objects on high-level functionality for variable refrigerant flow (VRF) air-conditioning systems for commercial buildings. First, the paper discusses a model of the air-conditioner cell that consists of a group of BACnet standard type objects using the Unified Modeling Language (UML). In addition, this paper provides a new concept of a virtual wattmeter using the BACnet Accumulator object type for power consumption allocation to each tenant of the building. Examples of computer simulation and field testing show the effectiveness of our approach to expedite communication access and to provide more accurate allocation of power consumption for VRF air-conditioning systems.

Units: SI

 


File Size : 1 file , 3.6 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 10
Product Code(s) : D-CH-09-036
Published : 2009

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138