CH-89-13-4 -- Cornmissioning---The Construction Phase PDF

CH-89-13-4 -- Cornmissioning---The Construction Phase PDF

Name:
CH-89-13-4 -- Cornmissioning---The Construction Phase PDF

Published Date:
1989

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

This paper outlines the role of commissioning in the construction phase. The goals are to reduce construction deficiencies so that the contractor can give the owner a system that is actually functioning as designed and, secondly, to increase the owner/operator’s familiarity with the operation of his systems.

Construction commissioning requires the contractor to share responsibility along with the owner for the proper operation of the building systems. The contractor must be responsible for the total installation, which includes verification that the system is functioning as designed.


File Size : 1 file , 740 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 6
Product Code(s) : D-24620
Published : 1989

History


Related products


Best-Selling Products