DA-00-01-2 -- Comparing Maintenance Costs of Geothermal Heat Pump Systems with Other HVAC Systems: Preventive Maintenance Actions and Total Maintenance Costs PDF

DA-00-01-2 -- Comparing Maintenance Costs of Geothermal Heat Pump Systems with Other HVAC Systems: Preventive Maintenance Actions and Total Maintenance Costs PDF

Name:
DA-00-01-2 -- Comparing Maintenance Costs of Geothermal Heat Pump Systems with Other HVAC Systems: Preventive Maintenance Actions and Total Maintenance Costs PDF

Published Date:
2000

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Total annual heating, ventilating, and air-conditioning (HVAC) maintenance costs were determined for 20 schools in the Lincoln, Nebraska, Public School District. Each school examined provides cooling to over 70% of its total floor area and relies on one of the following heating and cooling systems to provide the majority of space conditioning: vertical-bore, geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACC/GHWB), water-cooled chiller with gas-fired hot water boiler (WCC/GHWB), or water-cooled chiller with gas-fired steam boiler (WCC/GSB). A precursor to this study examined annual costs associated with repair, service, and corrective maintenance activities tracked in a work order database. This follow-up study examines costs associated with preventive maintenance (PM) activities conducted by the district. Annual PM costs were 5.87 ¢/ yr·ft2 (63.14 ¢/yr·m2 ) for ACC/GHWB schools, followed by 7.14 ¢/yr·ft2 (76.86 ¢/yr·m2 ) for GHP, 9.82 ¢/yr·ft2 (105.39 ¢/yr·m2 ) for WCC/GSB, and 12.65 ¢/yr·ft2 (136.30 ¢/yr·m2 ) for WCC/GHWB. The results of the two analyses are combined to produce an estimate of total annual maintenance costs, by system type, for the 20 schools. Total annual maintenance costs were 8.75 ¢/yr·ft2 (94.20 ¢/ yr·m2 ) for ACC/GHWB schools, followed by 9.27 ¢/yr·ft2 (99.76 ¢/yr·m2 ) for GHP, 13.54 ¢/yr·ft2 (145.49 ¢/yr·m2 ) for WCC/GSB, and 18.71 ¢/yr·ft2 (201.61 ¢/yr·m2 ) for WCC/GHWB. It should be noted that these costs represent only the trends seen in the maintenance database of the Lincoln School District. Because of differences in the number of schools using each system type, varying equipment age, and the small total number of schools included in the study, the maintenance costs presented here may not be representative of the maintenance costs seen for similar equipment in other locations.

Units: Dual


File Size : 1 file , 360 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 16
Product Code(s) : D-7338
Published : 2000

History


Related products


Best-Selling Products

2019 IADC Membership Directory
Published Date: 2019
$22.5
2020 IADC Membership Directory
Published Date: 2020
$22.5
2021 IADC Membership Directory
Published Date: 2021
$22.5
2022 IADC Membership Directory
Published Date: 2022
$22.5
2023 IADC Membership Directory
Published Date: 2023
$22.5
2024 IADC Membership Directory
Published Date: 2024
$22.5