DA-00-12-3 -- Thermal Storage Case Study: Combined Building Mass and Cooling Pond PDF

DA-00-12-3 -- Thermal Storage Case Study: Combined Building Mass and Cooling Pond PDF

Name:
DA-00-12-3 -- Thermal Storage Case Study: Combined Building Mass and Cooling Pond PDF

Published Date:
2000

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

In 1994 a large U.K. credit card company decided to relocate and centralize its offices and operations from a number of city center sites to the outskirts on a green field site. The company decided that the concept for the new building should be "environmentally friendly," i.e., naturally ventilated and cooled by openable windows. However, during initial studies there was concern over whether natural cooling and ventilation alone would be adequate to maintain thermal comfort during hot weather. The design solution was to provide a mix of passive and mechanical systems that could be switched in response to internal conditions and the prevailing weather. The object was to use passive features, i.e., the building thermal mass and storage and cooling effects of a pond, to maintain thermal comfort whenever possible and only switch to mechanical cooling under extreme conditions. The building was occupied progressively during the spring of 1997. The case study covers the period from the initial design concept to the end of the first 18 months of occupation.

Units: SI


File Size : 1 file , 140 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 9
Product Code(s) : D-7381
Published : 2000

History


Related products


Best-Selling Products

REA B50-1
Published Date: 10/04/1988
REA Standard T-805B, Electric Transmission Specifications and Drawings, 115 kv through 230 kV
$17.1