DA-88-25-2 -- Thermal Storage Retrofit Restores Dual Temperature System PDF

DA-88-25-2 -- Thermal Storage Retrofit Restores Dual Temperature System PDF

Name:
DA-88-25-2 -- Thermal Storage Retrofit Restores Dual Temperature System PDF

Published Date:
1988

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

The integration of thermal storage into the existing dual-temperature heating and cooling system allowed it to meet the requirements of the expanded industrial manufacturing facility while at the same time restoring the system’s performance.

The existing 5000 ton (17,600 kW) refrigeration plant installed in 1971 included two 860 ton (3027 kW) steam turbine centrifugal chillers piggy-backed on two 1640 ton (5772 absorption chillers. The chillers were directly coupled into a dual-temperature water system serving a 1,600,000 ft2 (148,640 m2) manufacturing plant, which is is part of a truck and bus facility. Operational problems with staging of the refrigeration plant and difficulties in steam turbine operations resulted in only partial system operation and, consequently, marginal performance over the last decade. The demands for a 2000 ton (7040 kW) increase in capacity, resulting from a 900,000 ft2 (8B,610 m2) plant expansion, coupled with the need for close environmental control resulted in a requirement for total retrofit of the system.

Alternative design concepts evaluated methods of improving plant operations and increasing system capacity. The studies concluded that the addition of two 750,000 gallon (2842 m2) thermal storage tanks would enable the refrigeration plant to meet the peak load demands without adding refrigeration equipment. The thermal storage tanks also provided stable load characteristics that resolved the multiple staging problems of the original turbine/absorption chiller combination. At the same time, these requirements were met with the lowest capital cost option while retaining the optimum operating cost characteristics of the original system design.

The installation was completed in the spring of 1987 and has been in operation ever since. Capital cost of the installation, as bid, was within 5% of initial estimates. However, actual installed cost increased by a further 8% during construction due to field conditions. The thermal storage system itself went in without any significant problems, the most prevalent problems being calibration and sensitivity of monitoring instrumentation.

The conclusions are that thermal storage can be justified as an integral part of system design. At the same time, it offers the benefits of increased plant operational stability and reliability and reduced operating costs through savings in utility demand charges.

Units: Dual

 


File Size : 1 file , 5 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 13
Product Code(s) : D-DA-88-25-2
Published : 1988

History


Related products


Best-Selling Products

ISO/PAS 11585:2023
Published Date: 09/01/2023
Road vehicles - Partial driving automation - Technical characteristics of conditional hands-free driving systems
$37.2
ISO/PAS 11819-4:2013
Published Date: 03/15/2013
Acoustics - Method for measuring the influence of road surfaces on traffic noise - Part 4: SPB method using backing board
$20.4
ISO/PAS 11856:2003
Published Date: 01/01/2003
Textile floor coverings - Test methods for the determination of fibre bind
$34.2
ISO/PAS 12006-3:2001
Published Date: 10/01/2001
Building construction - Organization of information about construction works - Part 3: Framework for object-oriented information exchange
$27.6
ISO/PAS 12158:2002
Published Date: 07/01/2002
Road vehicles - Braking systems - Temperature measuring methods
$20.4
ISO/PAS 12835:2013
Published Date: 12/15/2013
Qualification of casing connections for thermal wells
$75