Guideline 0-2019 -- The Commissioning Process PDF

Guideline 0-2019 -- The Commissioning Process PDF

Name:
Guideline 0-2019 -- The Commissioning Process PDF

Published Date:
2019

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$31.5
Need Help?
ASHRAE Guideline 0 presents best practices for applying whole-building commissioning to facilities. The principles and processes included apply to all phases of new construction and renovation projects and provide a uniform, integrated, and consistent approach to commissioning. ASHRAE Guideline 0 includes the Total Building Commissioning Process (TBCxP) as defined by National Institute of Building Sciences (NIBS) in its Commissioning Process Guideline 0.

This 2019 edition of ASHRAE Guideline 0 updates terminology to reflect an evolving whole-building Commissioning Process (Cx) and harmonizes terminology and its usage with that of ASHRAE/IES Stand-ard 202.
File Size : 1 file , 620 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 66
Product Code(s) : D-86856, 86856
Published : 2019
Redline File Size : 2 files , 8.5 MB
Units of Measure : Dual

History


Related products


Best-Selling Products

NCSL CALIB
Published Date:
Calibration Laboratory Manager´s Guidebook
NCSL RISP-1
Published Date: 01/01/2017
Josephson Voltage Standard
NCSL RISP-3
Published Date: 08/01/1997
Quantized Hall Resistance
NCSL RISP-4
Published Date: 07/01/1998
Deadweight Pressure Gauges
NCSL RISP-5
Published Date: 01/01/2017
Two-Pressure, Two Temperature Humidity Generator
NCSL RP-10
Published Date: 01/01/2004
Operation of Electric Utility Metrology Lab