OR-20-C064 -- Optimization of Design Solutions for Surplus Heating and Cooling System in Combination with Ground Source Heat Pump/Chillers PDF

OR-20-C064 -- Optimization of Design Solutions for Surplus Heating and Cooling System in Combination with Ground Source Heat Pump/Chillers PDF

Name:
OR-20-C064 -- Optimization of Design Solutions for Surplus Heating and Cooling System in Combination with Ground Source Heat Pump/Chillers PDF

Published Date:
2020

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?
Hospitals are one of the building categories in Norway which have the highest specific energy consumption. There is significant potential for optimization of the complex energy systems in hospitals by balancing the strongly varying requirements for heating and cooling as a function of time of day and time of year in different parts of the hospital. Sensitivity analysis of the thermal energy system with a focus on parameters of the ground storage system is enabled by combining different interactions between internal gains, hydronic heating, cooling, ground storage systems, and free cooling functions. In the planning of new hospitals using ground source heat pumps /chillers in combination, the number of boreholes, depth, distance between the boreholes and dimensioning of the Underground Thermal Energy Storage (UTES) is often not calculated very precisely but instead estimated by using rules of thumb. During an ongoing project, a simulation tool has been made with focus on temperature levels in the ground storage. A simulation model has been built up based on a 20,000 m2 (215200 ft2) regional hospital using a combination of the commercial building simulation tool SIMIEN and the energy analysis- and optimization tool VKB-sim. The simulations show the sensitivity of the energy system to changes in number of boreholes, borehole spacing and the dimensioning of the UTES. The paper shows the possibilities of heating the boreholes with the heat from exhaust air (coil in the exhaust air flow) to reduce the number of boreholes and/or the space between the boreholes, thus significantly decreasing the installation cost for ground storage facilities.
File Size : 1 file , 1 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 8
Product Code(s) : D-OR-20-C064
Published : 2020
Units of Measure : Dual

History


Related products


Best-Selling Products

MSS Comparator
Published Date:
MSS SP-112 Comparator
$25.5
MSS Complete Set
Published Date:
Complete Standards Collection of the MSS (Valve and Fittings Industry)
MSS SP-100-1997
Published Date: 01/01/1997
Qualification Requirements for Elastomer Diaphragms for Nuclear Service Diaphragm Type Valves
$34.8
MSS SP-100-2002
Published Date: 01/01/2002
Qualification Requirements for Elastomer Diaphragms for Nuclear Service Diaphragm Valves
$34.8
MSS SP-100-2009
Published Date: 01/01/2009
Qualification Requirements for Elastomer Diaphragms for Nuclear Service Diaphragm Valves
$21
MSS SP-100-2020
Published Date: 12/04/2020
Qualification Requirements for Elastomer Diaphragms for Nuclear Service Diaphragm Valves
$39.6